How It Works / 03
From drawings
to building system.
Design → Review → Resolve → Engineer → Manufacture → Deliver → Install. Each step reduces uncertainty before the next commitment.
Send us a project01 / The sequence
Resolve it in the right order.
- 01
Review
Send plans, elevations, sections or concept information. We assess the design stage and likely fit.
- 02
Feasibility
Review geometry, structure, panelisation, envelope, glazing, logistics and an indicative shell cost.
- 03
Design development
The architect develops the design while ARKFAB coordinates construction and manufacturing strategy.
- 04
Engineering
Project-specific structural, technical and local requirements are resolved with the appointed specialists.
- 05
Production documentation
The resolved project is translated into factory-ready panel and component information.
- 06
Manufacture
Panels and components are made and checked under controlled factory conditions.
- 07
Delivery
The shell is packed, containerised and transported to site in a planned erection sequence.
- 08
Installation
The local builder and erection team assemble the system with installation information and initial ARKFAB support.

02 / In parallel
The builder prepares the site.
While manufacturing is under way, the local builder advances foundations, local structure, services preparation and site access. The construction programme and handover points are coordinated before dispatch.
ARKFAB supplies the agreed shell package and assists with the first installation phase. The builder continues with services, internal trades, finishes and completion.
Read the builder interface03 / Responsibility
One project. Clear roles.
Architect
Design intent, documentation and project role as engaged.
ARKFAB
System review, panelisation, manufacturing coordination, supply, logistics and first-install support.
Engineer
Project-specific engineering and certification as required.
Builder
Overall site construction, local coordination, foundations, trades and completion.
Start with real architecture
Start with the drawings you already have.