Technical / 06

Technical logic.
Project-specific detail.

A due-diligence overview of the timber shell and envelope. Final assemblies, engineering and local compliance are resolved for each project.

Send us a project

01 / System principle

The assembly follows the architecture.

ARKFAB does not apply one fixed wall or roof specification to every project. Structural and envelope strategies respond to climate, geometry, loads, glazing, transport and local requirements.

The diagram below is conceptual. It is not an approved construction detail or a universal layer order.

Conceptual diagram of possible timber-panel layers, without a prescribed construction order
Typical elements / final sequence and specification by project.

02 / What is resolved

Structure, moisture, heat and weather.

01

Typical wall systems

Closed timber panels can incorporate framing, sheathing, insulation, airtightness and vapour-control strategy, weather membrane, battens and service cavity. Layer position is determined by project-specific design.

02

Roof + floor systems

Cassettes, trusses and engineered timber members are selected around span, geometry, services, transport, lifting and erection sequence.

03

Envelope continuity

Thermal bridging, air-barrier continuity, vapour control, weather protection, ventilated cavities and junctions are coordinated across the shell.

04

Windows + doors

Timber / aluminium-clad and uPVC options, double or triple glazing where appropriate, and factory installation are considered against architecture and performance requirements.

05

Cladding + roofing

Timber, sheet, panel or metal cladding and suitable roofing systems can be considered; factory versus site installation depends on fixing, transport and damage risk.

06

Local adaptation

Structural engineering, climate, condensation, termites, fire / bushfire, wind and seismic requirements, approvals and site interfaces are assessed locally.

Glazed timber interior

03 / Interfaces

A junction is a design decision.

Window-to-wall and roof-to-wall connections are reviewed as part of the system rather than left for improvisation on site. Factory installation can help when openings, structure and membrane connections are sufficiently resolved.

No generic ARKFAB detail is automatically compliant across Australia or New Zealand. Project-specific engineering, certification and approval remain necessary.

04 / Resource library

Approved details will be published here.

Wall details, roof details, window junctions, installation guides, sample specifications and technical data sheets are planned. No draft document is presented as an approved public resource.

Have a detail to test? Send the drawings